First demonstrated lunar landing-pad construction system

Surface construction·2026–2032Market opens soon
← All prizes

Prize pool

—

Providers

5

Target window

2026–2032

Soft regolith and lander plumes threaten every sustained surface operation — hardened landing pads, roads, and berms are the first infrastructure any base needs. Multiple companies are racing this capability with genuinely different technology bets: laser/large-scale printing (ICON), microwave sintering (Redwire), molten-regolith bricks (Astroport), regolith-polymer printing (AI SpaceFactory), and a self-curing, no-heat regolith binder inherited by Astrobotic from Masten Space Systems. A future MoonDAO DePrize would reward the first team to meet the frozen capability criteria below.

Lunar South Pole — candidate construction zone

Competitors are listed at MoonDAO’s editorial discretion. Listing does not mean the organization has entered, endorsed, or is affiliated with this prize. Bets are on outcomes, not on any affiliation.

The ETH market for this race opens soon. Predict the winner for free now. See this race on Moon Base Zero.

Competitors

Click a competitor to predict them as the winner.

ICICON

—

chance

RERedwire

—

chance

ASAstroport Space Technologies

—

chance

ASAI SpaceFactory

—

chance

VLVoyager Lunar Systems

—

chance

Capability criteria (draft)

  1. 1Produce a continuous load-bearing surface from lunar regolith simulant

    ≥ 25 m²; ≥ 90% regolith feedstock by mass

  2. 2Survive a published plume / mechanical load profile

    MoonDAO-frozen spec derived from NASA/ESA plume-surface interaction data

  3. 3Demonstrate the process in a relevant environment

    Vacuum and/or lunar thermal extremes; exact bar frozen at market open

  4. 4Publish an open performance data pack for peer review and simulation use

    Strength, thickness, energy per kg, dust shedding

  5. 5Quote a CLPS-class flight demonstration within budget

    Quote ≤ prize-pool TWAP at market close